Project
Eltiera Views
Eltiera Views is a multi-building complex planned for Jumeirah Heights, Jumeirah Islands, Al Thanyah Fifth, Dubai. An off-plan project of apartments and shops in Jumeirah Lakes Towers, priced in line with the Jumeirah Lakes Towers median.

01 / Transactions
Latest Eltiera Views transactions
02 / About
About Eltiera Views
Eltiera Views is a multi-building complex planned for Jumeirah Heights, Jumeirah Islands, Al Thanyah Fifth, Dubai.
Eltiera Views at a glance
- Area
- Jumeirah Heights
- Developer
- Ellington Properties Development through its subsidiary Ellington PCFC Developers
- Units
- The development will contain an estimated 1,185 units
- History
- The project occupies a plot of land that was initially intended for a different development, Jumeirah Heights Frond A, which has since been cancelled
Homes, design and facilities
Eltiera Views Tower 1 will comprise a mix of one- , two- , and three-bedroom apartments as well as two penthouses and four retail units; Eltiera Views Tower 2 will comprise a mix of one- , two- , and three-bedroom apartments as well as two penthouses; Eltiera Views Tower 3 will comprise a mix of one- , two- , and three-bedroom apartments as well as two penthouses and a retail unit; Eltiera Views Tower 4 will comprise a mix of one- , two- , and three-bedroom apartments as well as two penthouses.
Payment plan: The project was launched with an installment plan allowing investors to pay 20% as a deposit on booking, 50% during the construction phase, and 30% upon handover of the property. Down payment 20% Construction 50% Handover 30%.
The ground floor is allocated to retail and dining outlets and contains a supermarket.
The exterior façade is composed of folded planes of metal.
Interior finishes incorporate textured surfaces and a 'calm' base palette with accent tones.
Living areas are arranged to accommodate both social gatherings and can adapt to varied activities.
The clubhouse spans four levels and contains a co-working area with private rooms, collaborative workstations and informal breakout corners.
A cinema room is provided with upholstered seating and acoustic treatment, and there is a separate games room for recreational use.
The development has multiple pools, including two infinity pools, one designated for families and one for adults.
Kitchens have generous islands and integrated fittings.
Penthouse bathrooms are larger than standard units and are fitted with freestanding baths.
The anticipated service charge is AED 21 per square foot.
All residential floors have a floor-to-ceiling height of 3.6 metres.
Each building has six passenger elevators and one service elevator.
The parking allocation is one parking space for one- and two-bedroom units and two parking spaces for three-bedroom units.
The development provides a mix of unit types that comprise one-bedroom, two-bedroom, two-bedroom plus study and three-bedroom apartments, as well as three-bedroom penthouses.
The ground-floor co-working club layout contains reception and communal working facilities including a reception lounge, communal table, working pods, meeting room and a podcast room.
The wellness club on Podium 1 includes dedicated areas for calisthenics, strength training, pilates, yoga, spin and cardio, a climbing wall, a vitality pool, heated relaxation beds and male and female changing facilities with shower, steam and sauna.
- Amenities will include an attractive lobby space
- a children's play area
- a cinema room
- a club room
- a clubhouse
- a co-working space
- a dance studio
- dining options
- a family infinity pool
- fitness studios
- food and beverage outlets
- a games room
- a gym
- an infinity pool
- a landscaped podium
- a lounge
- retail outlets
- social activity areas
- spa areas
- spa facilities
- a spacious terrace
- sports courts
- steam and sauna rooms
- a supermarket
- swimming pools
- winding walkways
- and a yoga area
Buildings in the development
The development comprises four individual buildings: Eltiera Views Tower 1, Eltiera Views Tower 2, Eltiera Views Tower 3, and Eltiera Views Tower 4.
- Eltiera Views Tower 1
- Eltiera Views Tower 2
- Eltiera Views Tower 3
- Eltiera Views Tower 4
Construction and handover
The estimated handover date is Q4 2029.
- Estimated Completion
- Q4 2029
Nearby neighbourhoods
- Jumeirah Lakes Towers0.8 km
- Jumeirah Islands1.1 km
- The Meadows1.2 km
- Jumeirah Park1.5 km
Eltiera Views recorded 632 market sales from 22 May 2026 – 8 Oct 2026, at a median price of AED 2,239,328 (AED 2,499/sqft). Eltiera Views's median price per sqft (AED 2,499/sqft) is 1% below the Jumeirah Lakes Towers median (AED 2,521/sqft).
03 / Prices
Eltiera Views prices by bedrooms
Median prices of market sales by number of bedrooms.
| Bedrooms | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
1 bedroom | 374 | 2.06M AED | 2,532 | |
2 bedrooms | 200 | 3.18M AED | 2,376 | |
3 bedrooms | 54 | 4.13M AED | 2,469 | |
4 bedrooms | 2 | 14.24M AED | 2,388 |
Market pulse / weekly
Eltiera Views price history
Weekly median of market sales (sales, mortgages and gifts are not mixed). Periods without sales are not shown.
Median sale price · AED
Registered market sales only
View data table
| Period | Sales | Median · AED | AED / sqft |
|---|---|---|---|
| Week of 18 May 2026Total AED 42,002,420 | 15 | AED 2,311,828 | AED 2,772/sqft |
| Week of 25 May 2026Total AED 46,391,904 | 18 | AED 2,192,328 | AED 2,659/sqft |
| Week of 1 Jun 2026Total AED 381,074,436 | 137 | AED 2,264,828 | AED 2,671/sqft |
| Week of 8 Jun 2026Total AED 187,388,164 | 63 | AED 2,241,828 | AED 2,678/sqft |
| Week of 15 Jun 2026Total AED 16,506,968 | 6 | AED 2,298,328 | AED 2,707/sqft |
| Week of 22 Jun 2026Total AED 85,591,980 | 35 | AED 2,552,828 | AED 2,174/sqft |
| Week of 29 Jun 2026Total AED 165,700,444 | 73 | AED 1,902,828 | AED 2,203/sqft |
| Week of 6 Jul 2026Total AED 101,486,776 | 42 | AED 1,961,328 | AED 2,246/sqft |
| Week of 13 Jul 2026Total AED 289,471,360 | 120 | AED 1,991,828 | AED 2,313/sqft |
| Week of 20 Jul 2026Total AED 40,557,592 | 14 | AED 2,693,328 | AED 2,560/sqft |
| Week of 27 Jul 2026Total AED 28,250,108 | 11 | AED 2,205,828 | AED 2,679/sqft |
| Week of 3 Aug 2026Total AED 111,970,636 | 37 | AED 2,011,828 | AED 2,355/sqft |
| Week of 10 Aug 2026Total AED 26,427,452 | 9 | AED 2,826,828 | AED 2,673/sqft |
| Week of 17 Aug 2026Total AED 26,211,624 | 9 | AED 2,983,828 | AED 2,593/sqft |
| Week of 24 Aug 2026Total AED 7,592,484 | 3 | AED 2,105,828 | AED 2,525/sqft |
| Week of 31 Aug 2026Total AED 20,191,452 | 9 | AED 2,107,828 | AED 2,605/sqft |
| Week of 7 Sept 2026Total AED 21,945,452 | 9 | AED 2,119,828 | AED 2,537/sqft |
| Week of 14 Sept 2026Total AED 23,340,624 | 8 | AED 2,774,328 | AED 2,713/sqft |
| Week of 21 Sept 2026Total AED 26,324,452 | 9 | AED 2,951,828 | AED 2,565/sqft |
| Week of 28 Sept 2026Total AED 3,299,828 | 1 | AED 3,299,828 | AED 2,620/sqft |
| Week of 5 Oct 2026Total AED 9,437,312 | 4 | AED 2,231,328 | AED 2,627/sqft |
04 / Nearby
Other projects in Jumeirah Lakes Towers
Ranked by number of market sales.
| Project | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
| 118 | 3.76M AED | 2,643 | ||
| 43 | 3.58M AED | 2,615 |
A registered project can include several buildings or phases, so these figures cover the whole project.