Project
Wilton Terraces
Wilton Terraces is a multi-building complex in Sobha Hartland, Meydan One, Meydan, Mohammed Bin Rashid City, Dubai. A completed project of apartments in Sobha Hartland, priced in line with the Sobha Hartland median.

01 / Transactions
Latest Wilton Terraces transactions
02 / About
About Wilton Terraces
Wilton Terraces is a multi-building complex in Sobha Hartland, Meydan One, Meydan, Mohammed Bin Rashid City, Dubai.
Wilton Terraces at a glance
- Area
- Sobha Hartland
- Developer
- Ellington Properties Development
- Units
- The development contains a total of 283 units
- Unit layouts
- Each building comprises a mix of one- and two-bedroom apartments
- Architect
- The architectural consultant was Dubai Consultants and the architectural consultant was Perkins & Will
- Contractor
- The main building work was done by Aroma International Building Contractors
Homes, design and facilities
The two towers contain one- and two-bedroom apartments.
The kitchens are fitted with custom cabinetry and polished countertops, and furnished with refrigerator and signature sinks and fixtures.
Every residence overlooks green gardens and is interspersed with public squares and water features.
The 12-storey towers sit on a single three-storey podium that contains the car park.
The facilities are situated on a recreational space on the podium between the two towers.
By February 2020 all apartments had been sold.
- barbecue area
- a children's pool
- a gym
- an indoor play area
- swimming pool
Getting around
- Dubai Mall
- 15 min
- Palm Jumeirah
- 25 min
- Burj Al Arab
- 24 min
- The Walk JBR
- 29 min
Travel times are approximate driving estimates reported by the source and vary with route and traffic.
Buildings in the development
The development comprises two individual buildings: Wilton Terraces Tower 1 and Wilton Terraces Tower 2.
- Wilton Terraces Tower 1
- Wilton Terraces Tower 2
Construction and handover
Construction began in September 2017. The estimated handover date was May 2020. The project was completed in Nov 2021.
- Construction Started
- September 2017
- Estimated Completion
- May 2020
- Construction Finished
- November 2021
Nearby neighbourhoods
- Azizi Riviera0.7 km
- Meydan2.5 km
- The Polo Residence3.3 km
- Mohammed Bin Rashid City3.4 km
Wilton Terraces recorded 34 market sales from 7 Jan 2026 – 8 Oct 2026, at a median price of AED 1,560,000 (AED 1,868/sqft). Wilton Terraces's median price per sqft (AED 1,868/sqft) is 6% below the Sobha Hartland median (AED 1,987/sqft).
03 / Prices
Wilton Terraces prices by bedrooms
Median prices of market sales by number of bedrooms.
| Bedrooms | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
1 bedroom | 24 | 1.5M AED | 1,855 | |
2 bedrooms | 10 | 2.34M AED | 1,909 |
04 / Rents
Renting in Wilton Terraces
From 11 registered market rents. Gross yield: apartment rent per sqft against the sale price per sqft.
- Median rent / yr
- AED 90,000
- Per sqft / yr
- AED 113/sqft
- Gross yield
- 6.0%
Market pulse / weekly
Wilton Terraces price history
Weekly median of market sales (sales, mortgages and gifts are not mixed). Periods without sales are not shown.
Median sale price · AED
Registered market sales only
View data table
| Period | Sales | Median · AED | AED / sqft |
|---|---|---|---|
| Week of 5 Jan 2026Total AED 1,687,458 | 2 | AED 843,729 | AED 1,025/sqft |
| Week of 12 Jan 2026Total AED 3,905,000 | 2 | AED 1,952,500 | AED 1,910/sqft |
| Week of 26 Jan 2026Total AED 3,930,000 | 2 | AED 1,965,000 | AED 1,923/sqft |
| Week of 2 Feb 2026Total AED 5,650,000 | 3 | AED 1,675,000 | AED 1,959/sqft |
| Week of 16 Feb 2026Total AED 1,500,000 | 1 | AED 1,500,000 | AED 1,834/sqft |
| Week of 23 Feb 2026Total AED 2,980,000 | 2 | AED 1,490,000 | AED 1,897/sqft |
| Week of 9 Mar 2026Total AED 1,490,000 | 1 | AED 1,490,000 | AED 1,828/sqft |
| Week of 23 Mar 2026Total AED 1,550,000 | 1 | AED 1,550,000 | AED 1,847/sqft |
| Week of 30 Mar 2026Total AED 2,450,000 | 1 | AED 2,450,000 | AED 2,044/sqft |
| Week of 6 Apr 2026Total AED 2,515,000 | 1 | AED 2,515,000 | AED 2,098/sqft |
| Week of 20 Apr 2026Total AED 1,540,000 | 1 | AED 1,540,000 | AED 1,889/sqft |
| Week of 18 May 2026Total AED 4,300,000 | 3 | AED 1,470,000 | AED 1,752/sqft |
| Week of 8 Jun 2026Total AED 1,490,000 | 1 | AED 1,490,000 | AED 1,776/sqft |
| Week of 29 Jun 2026Total AED 1,460,000 | 1 | AED 1,460,000 | AED 1,859/sqft |
| Week of 6 Jul 2026Total AED 2,155,000 | 1 | AED 2,155,000 | AED 1,742/sqft |
| Week of 20 Jul 2026Total AED 73,584 | 1 | AED 73,584 | AED 90/sqft |
| Week of 17 Aug 2026Total AED 2,200,000 | 1 | AED 2,200,000 | AED 1,778/sqft |
| Week of 31 Aug 2026Total AED 1,610,000 | 1 | AED 1,610,000 | AED 1,968/sqft |
| Week of 7 Sept 2026Total AED 1,570,000 | 1 | AED 1,570,000 | AED 1,851/sqft |
| Week of 14 Sept 2026Total AED 6,550,000 | 3 | AED 2,200,000 | AED 1,835/sqft |
| Week of 21 Sept 2026Total AED 1,630,000 | 1 | AED 1,630,000 | AED 1,993/sqft |
| Week of 28 Sept 2026Total AED 1,330,000 | 1 | AED 1,330,000 | AED 1,694/sqft |
| Week of 5 Oct 2026Total AED 3,085,000 | 2 | AED 1,542,500 | AED 1,865/sqft |
05 / Nearby
Other projects in Sobha Hartland
Ranked by number of market sales.
| Project | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
| 147 | 1.65M AED | 2,217 | ||
| 146 | 2.7M AED | 1,952 | ||
| 104 | 1.11M AED | 1,838 | ||
| 50 | 1.14M AED | 2,032 | ||
| 46 | 509.88K AED | 974 | ||
| 42 | 2.92M AED | 1,987 | ||
| 37 | 1.22M AED | 2,082 | ||
| 28 | 2.34M AED | 2,126 | ||
| 27 | 1.9M AED | 2,221 | ||
| 23 | 2.25M AED | 1,967 |
A registered project can include several buildings or phases, so these figures cover the whole project.