Skip to content

Project

The Orchard Place - Tower C

The Orchard Place Tower C is a 25-storey residential building under development in JVC District 12, Jumeirah Village Circle, Dubai. An off-plan project of apartments in Jumeirah Village Circle, priced in line with the Jumeirah Village Circle median.

Based on only 1 sale — not representative of the market.

ApartmentOff-plan
The Orchard Place - Tower C, Dubai

01 / Transactions

All The Orchard Place - Tower C transactions

Transaction type
Property type
Bedrooms
Status
Sort
1 visibleShowing 1–1
Registered transactions. Prices in AED.
PropertyPricePer sq ftSpecsRecordedOpen
AED 800,000AED 1,517 per sq ftStudio527 sq ft25 Jun 2026Sale

02 / About

About The Orchard Place - Tower C

The Orchard Place Tower C is a 25-storey residential building under development in JVC District 12, Jumeirah Village Circle, Dubai.

The Orchard Place Tower C at a glance

Area
JVC District 12
Developer
Peak Summit Real Estate Development
Units
The development will contain an estimated 193 units
Architect
The architectural consultant is Federal Engineering Consultants
Contractor
The foundation work is being carried out by Delta Foundations Company
Storeys
25 storeys

Homes, design and facilities

The Orchard Place Tower C will comprise a mix of studios, one- , two- , and three-bedroom apartments as well as penthouses, duplexes, and loft apartments.

Payment plan: The project was launched with an installment plan allowing investors to pay 60% during the construction phase and 40% upon handover of the property. Construction 60% Handover 40%.

There are over 1,500 parking spaces.

Tower A has a ground floor, four podium levels and 23 residential storeys above, together with lobby and commercial areas. Tower B has 30 residential storeys. Tower C has 20 residential storeys.

Each tower has a penthouse level with terraces that feature private swimming pools.

The development contains restaurants and office facilities, as well as fitness centres and other shared amenities.

There are landscaped areas with greenery, open gardens, planting, seating and walking paths.

The project features a 25-metre infinity swimming pool with an island in the centre.

There is a separate children’s pool located next to the children’s area.

Two fully equipped barbecue areas are located in different corners of the site, with an application available for booking time slots.

There is a multifunctional communal space with communal tables and a kitchenette, suitable for co-working, socialising and hosting events or workshops.

The gym has a large terrace suitable for activities such as yoga and stretching.

The project includes a two-level kids’ club designed for different age groups, with an outdoor playground and a children’s swimming pool.

Each apartment has a balcony, while the penthouses have large terraces with private swimming pools.

Kitchens use artificial stone for surfaces and feature a back wall and an island, along with built-in kitchen appliances.

  • Amenities will include changing rooms
  • a children's playground
  • a children's swimming pool
  • a common room
  • a fitness area
  • a fitness centre
  • floor-to-ceiling windows
  • a padel tennis court
  • private gardens
  • a sauna
  • seating areas
  • a swimming pool
  • a terrace garden
  • and a walking track

Getting around

Dubai Mall
24 min
Palm Jumeirah
19 min
Burj Al Arab
21 min
The Walk JBR
24 min

Travel times are approximate driving estimates reported by the source and vary with route and traffic.

Construction and handover

The estimated handover date is Q4 2026.

Estimated Start
June 2024
Estimated Completion
Q4 2026

Nearby neighbourhoods

  • Victory Heights1.8 km
  • Sports City2.2 km
  • Arjan2.6 km
  • Jumeirah Village Triangle2.7 km
View location on Google Maps

The Orchard Place - Tower C recorded one market sale, for AED 800,000 (AED 1,517/sqft), on 25 Jun 2026. The Orchard Place - Tower C's price per sqft (AED 1,517/sqft) is 3% above the Jumeirah Village Circle median (AED 1,468/sqft).

03 / Payment plan

The Orchard Place - Tower C payment plan

How the price was split between booking, construction and handover at launch.

Down payment
—
Not a separate stage of this plan
During construction
60%
Paid in instalments while it is built
Handover
40%
Paid when the keys are handed over

The launch plan as published by Propsearch. Terms can differ by unit, offer and date.

04 / Prices

The Orchard Place - Tower C prices by bedrooms

Median prices of market sales by number of bedrooms.

Market sale medians. Prices in AED.
BedroomsSalesMedian · AEDAED / sqftOpen
Studio527 sqft
1800K AED1,517

05 / Nearby

Ranked by number of market sales.

Projects ranked by market sales. Prices in AED.
ProjectSalesMedian · AEDAED / sqftOpen
01
Serenz by Danube381 – 2,420 sqft
5821.19M AED2,254
02
Binghatti Apex409 – 2,585 sqft
2541M AED1,485
03
Stax384 – 1,518 sqft
2331.02M AED1,452
04
Luma Park Views798 – 1,711 sqft
1641.39M AED1,614
05
Oxford Cove388 – 2,472 sqft
1621.1M AED1,564
06
Auresta Tower328 – 1,138 sqft
157667.52K AED1,506
07
Pearl House IV by Imtiaz401 – 1,461 sqft
1551.33M AED1,639
08
368 Park Ln439 – 2,323 sqft
1101.09M AED1,384
09
311 Boulevard by Bam Eskan479 – 1,707 sqft
1081.17M AED1,350
10
Binghatti Amberhall362 – 2,066 sqft
96925K AED1,956

06 / Talk to us

Interested in The Orchard Place - Tower C?

Answer a few short questions and we will get back to you.

Step 1 of 5

What would you like to do?

A registered project can include several buildings or phases, so these figures cover the whole project.