Project
The Orchard Place - Tower C
The Orchard Place Tower C is a 25-storey residential building under development in JVC District 12, Jumeirah Village Circle, Dubai. An off-plan project of apartments in Jumeirah Village Circle, priced in line with the Jumeirah Village Circle median.
Based on only 1 sale — not representative of the market.

01 / Transactions
All The Orchard Place - Tower C transactions
02 / About
About The Orchard Place - Tower C
The Orchard Place Tower C is a 25-storey residential building under development in JVC District 12, Jumeirah Village Circle, Dubai.
The Orchard Place Tower C at a glance
- Area
- JVC District 12
- Developer
- Peak Summit Real Estate Development
- Units
- The development will contain an estimated 193 units
- Architect
- The architectural consultant is Federal Engineering Consultants
- Contractor
- The foundation work is being carried out by Delta Foundations Company
- Storeys
- 25 storeys
Homes, design and facilities
The Orchard Place Tower C will comprise a mix of studios, one- , two- , and three-bedroom apartments as well as penthouses, duplexes, and loft apartments.
Payment plan: The project was launched with an installment plan allowing investors to pay 60% during the construction phase and 40% upon handover of the property. Construction 60% Handover 40%.
There are over 1,500 parking spaces.
Tower A has a ground floor, four podium levels and 23 residential storeys above, together with lobby and commercial areas. Tower B has 30 residential storeys. Tower C has 20 residential storeys.
Each tower has a penthouse level with terraces that feature private swimming pools.
The development contains restaurants and office facilities, as well as fitness centres and other shared amenities.
There are landscaped areas with greenery, open gardens, planting, seating and walking paths.
The project features a 25-metre infinity swimming pool with an island in the centre.
There is a separate children’s pool located next to the children’s area.
Two fully equipped barbecue areas are located in different corners of the site, with an application available for booking time slots.
There is a multifunctional communal space with communal tables and a kitchenette, suitable for co-working, socialising and hosting events or workshops.
The gym has a large terrace suitable for activities such as yoga and stretching.
The project includes a two-level kids’ club designed for different age groups, with an outdoor playground and a children’s swimming pool.
Each apartment has a balcony, while the penthouses have large terraces with private swimming pools.
Kitchens use artificial stone for surfaces and feature a back wall and an island, along with built-in kitchen appliances.
- Amenities will include changing rooms
- a children's playground
- a children's swimming pool
- a common room
- a fitness area
- a fitness centre
- floor-to-ceiling windows
- a padel tennis court
- private gardens
- a sauna
- seating areas
- a swimming pool
- a terrace garden
- and a walking track
Getting around
- Dubai Mall
- 24 min
- Palm Jumeirah
- 19 min
- Burj Al Arab
- 21 min
- The Walk JBR
- 24 min
Travel times are approximate driving estimates reported by the source and vary with route and traffic.
Construction and handover
The estimated handover date is Q4 2026.
- Estimated Start
- June 2024
- Estimated Completion
- Q4 2026
Nearby neighbourhoods
- Victory Heights1.8 km
- Sports City2.2 km
- Arjan2.6 km
- Jumeirah Village Triangle2.7 km
The Orchard Place - Tower C recorded one market sale, for AED 800,000 (AED 1,517/sqft), on 25 Jun 2026. The Orchard Place - Tower C's price per sqft (AED 1,517/sqft) is 3% above the Jumeirah Village Circle median (AED 1,468/sqft).
03 / Payment plan
The Orchard Place - Tower C payment plan
How the price was split between booking, construction and handover at launch.
- Down payment
- —
- Not a separate stage of this plan
- During construction
- 60%
- Paid in instalments while it is built
- Handover
- 40%
- Paid when the keys are handed over
The launch plan as published by Propsearch. Terms can differ by unit, offer and date.
04 / Prices
The Orchard Place - Tower C prices by bedrooms
Median prices of market sales by number of bedrooms.
| Bedrooms | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
Studio | 1 | 800K AED | 1,517 |
05 / Nearby
Other projects in Jumeirah Village Circle
Ranked by number of market sales.
| Project | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
| 582 | 1.19M AED | 2,254 | ||
| 254 | 1M AED | 1,485 | ||
03 | 233 | 1.02M AED | 1,452 | |
| 164 | 1.39M AED | 1,614 | ||
| 162 | 1.1M AED | 1,564 | ||
| 157 | 667.52K AED | 1,506 | ||
| 155 | 1.33M AED | 1,639 | ||
| 110 | 1.09M AED | 1,384 | ||
| 108 | 1.17M AED | 1,350 | ||
| 96 | 925K AED | 1,956 |
06 / Talk to us
Interested in The Orchard Place - Tower C?
Answer a few short questions and we will get back to you.
A registered project can include several buildings or phases, so these figures cover the whole project.