Project
Beachgate by Address
Beachgate by Address is a 45-storey residential building under development in Emaar Beachfront, Dubai Harbour, Dubai Marina, Dubai. A project with off-plan and ready sales of apartments in Dubai Harbour, priced above the Dubai Harbour median.
Small sample (13 sales): medians may move significantly with new data.

01 / Transactions
All Beachgate by Address transactions
02 / About
About Beachgate by Address
Beachgate by Address is a 45-storey residential building under development in Emaar Beachfront, Dubai Harbour, Dubai Marina, Dubai.
Beachgate by Address at a glance
- Area
- Emaar Beachfront
- Brand partnership
- Developed in collaboration with Address Hotels + Resorts. Learn more
- Developer
- Emaar Properties through its subsidiary Emaar Development
- Units
- The development will contain an estimated 2 units
- Architect
- The architectural consultant is Mirage Leisure & Development
- Contractor
- The main building work is being done by Al Sahel Contracting
- Structure
- The substructure contains one basement level which is used for parking
Homes, design and facilities
Beachgate by Address will comprise a mix of one- , two- , three- , and four-bedroom apartments as well as penthouses, duplexes, and two retail units.
The tower comprises Address-branded luxury residences.
The apartments have open-plan living spaces, light tones, "elegant finishes," and floor-to-ceiling windows.
As with all of the buildings on Emaar Beachfront, the residents have access to a 1.5 km long stretch of private beach.
The tower sits directly on the east promenade and is located within a short walk of the community park.
- Amenities will include a children's pool
- a fully-equipped gym
- a multi-purpose room
- retail outlets
- swimming pool
Getting around
- Dubai Mall
- 24 min
- Palm Jumeirah
- 14 min
- Burj Al Arab
- 19 min
- The Walk JBR
- 11 min
Travel times are approximate driving estimates reported by the source and vary with route and traffic.
Construction and handover
Construction began in November 2022. The estimated handover date is December 2026.
- Construction Started
- November 2022
- Estimated Completion
- December 2026
Nearby neighbourhoods
- Dubai Media City1.3 km
- Palm Jumeirah2.2 km
- Jumeirah Beach Residence2.6 km
- Dubai Marina2.6 km
Beachgate by Address recorded 13 market sales from 18 Jan 2026 – 13 Oct 2026, at a median price of AED 6,480,888 (AED 4,313/sqft). Beachgate by Address's median price per sqft (AED 4,313/sqft) is 21% above the Dubai Harbour median (AED 3,566/sqft).
03 / Prices
Beachgate by Address prices by bedrooms
Median prices of market sales by number of bedrooms.
| Bedrooms | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
1 bedroom | 2 | 3.04M AED | 3,834 | |
2 bedrooms | 4 | 5.4M AED | 4,341 | |
3 bedrooms | 6 | 7.13M AED | 4,115 | |
4 bedrooms | 1 | 10.85M AED | 4,463 |
Market pulse / weekly
Beachgate by Address price history
Weekly median of market sales (sales, mortgages and gifts are not mixed). Periods without sales are not shown.
Median sale price · AED
Registered market sales only
View data table
| Period | Sales | Median · AED | AED / sqft |
|---|---|---|---|
| Week of 12 Jan 2026Total AED 3,100,000 | 1 | AED 3,100,000 | AED 3,908/sqft |
| Week of 9 Feb 2026Total AED 10,850,888 | 1 | AED 10,850,888 | AED 4,463/sqft |
| Week of 16 Mar 2026Total AED 16,550,000 | 3 | AED 5,400,000 | AED 4,369/sqft |
| Week of 30 Mar 2026Total AED 9,547,776 | 2 | AED 4,773,888 | AED 3,759/sqft |
| Week of 6 Apr 2026Total AED 6,480,888 | 1 | AED 6,480,888 | — |
| Week of 18 May 2026Total AED 8,587,888 | 1 | AED 8,587,888 | AED 4,315/sqft |
| Week of 1 Jun 2026Total AED 4,700,000 | 1 | AED 4,700,000 | AED 3,803/sqft |
| Week of 14 Sept 2026Total AED 7,250,000 | 1 | AED 7,250,000 | AED 3,642/sqft |
| Week of 5 Oct 2026Total AED 7,000,000 | 1 | AED 7,000,000 | AED 3,916/sqft |
| Week of 12 Oct 2026Total AED 10,501,888 | 1 | AED 10,501,888 | AED 5,276/sqft |
04 / Nearby
Other projects in Dubai Harbour
Ranked by number of market sales.
| Project | Sales | Median · AED | AED / sqft | Open |
|---|---|---|---|---|
| 47 | 4.1M AED | 3,276 | ||
| 44 | 3.59M AED | 3,563 | ||
| 41 | 3M AED | 3,389 | ||
04 | 26 | 4.83M AED | 5,081 | |
| 23 | 7.5M AED | 4,094 | ||
| 22 | 3.03M AED | 2,725 | ||
| 21 | 2.98M AED | 3,349 | ||
| 21 | 2.7M AED | 3,359 | ||
09 | 21 | 5M AED | 4,682 | |
| 14 | 4.45M AED | 3,525 |
A registered project can include several buildings or phases, so these figures cover the whole project.